Construction Related Traffic Advisories
Road Name Location Description Status Date
Bear Creek RdPM 7.00The County of Santa Cruz Department of Public Works has announced that repairs on Bear Creek Road at PM 7.00 . Work will begin Wednesday, June 16, 2020Work is expected to last through October A temporary traffic signal will be in place between 7:30 a.m. to 5:00 p.m. and up to 20-minute delays should be anticipated
East Zayante RdQuail Hollow Rd. to Eagle Tree LnWednesday, July 22 through Thursday, August 6, 2020 The County of Santa Cruz Department of Public Works has announced that work on the digout asphalt repair portion of the two projects will take place on the dates and roadways noted below. Project roadways will be subject to traffic delays with potential lane and road closures between the hours of 8:30 a.m. to 4:30 p.m.
Empire GradePM 9.37 (1200` S/O McGIVERN WY ) TO PM 10.67 (100`S/O QUARRY BEND RD ) Santa Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement .
Glen Arbor RdHWY 9 north to HWY 9 southMonday, July 13 through Thursday, July 23, 2020 The County of Santa Cruz Department of Public Works has announced that work on the digout asphalt repair portion of the two projects will take place on the dates and roadways noted below. Project roadways will be subject to traffic delays with potential lane and road closures between the hours of 8:30 a.m. to 4:30 p.m.
Graham Hill RdSIMS RD TO LOCKWOOD LNSanta Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement
Highland WayPM 3.19 , 3.24 , 3.73 , 3.91 , 5.45 Highland Way beginning Tuesday , May 5 , through Friday , October 30 , 2020 . Lane closures and delays will be necessary for construction or soldier pile retaining walls and road improvements Temporary stop signs and traffic signals will be in place for the duration of the project .
Hihn RdGLEN ARBOR RD TO S ENDSanta Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement
Jamison Creek RdPM 0.70 to 1.44The County of Santa Cruz Department of Public Works has announced that repairs on Jamison Creek Road Wednesday, June 24, 2020 Work is expected to last through August 14Full closures between PM 0.70 to PM 1.44 will begin on Monday, June 29, 2020, during the hours of 9:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:00 p.m., on the weekdays. When full closures are not in place, prepare for 20-minute delays.
Laurel Glen RdNORTH RODEO GULCH RD TO SOQ SAN JOSE RDSanta Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement
Lockewood Ln100` N/O GRAHAM HILL RD TO SV CITY LIMITSanta Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement
Mountain View RdBRANCIFIRTE DR TO NOTRTH RODEO GULCH RDSanta Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement
Mt Hermon RdPM 1.31 TO SV CITY LIMITSanta Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement
Pioneer RdAMESTI RD TO GREEN VALLEY RDSanta Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement
Redwood Lodge Rdpost miles 1.50, 1.65, 1.80, and 2.02 The County of Santa Cruz Department of Public Works has announced that Redwood Lodge Road will be subject to traffic delays with lane closures beginning Monday, June 22, through Monday, November 30, 2020These lane closures and delays are necessary for construction of soldier pile retaining walls and roadway improvements.
Rodeo Gulch Rd Np.m. 0.92Beginning Monday, June 15, through Wednesday, September 9, 2020 These delays and road closures are necessary for construction of a soldier pile retaining wall and roadway improvementsthe initial traffic control pattern will resume consisting of daily road closures from 7:00 a.m. to 5:00 p.m. Please use the posted detours during this period .
Rodeo Gulch Rd NPM 1.96 to PM 3.59Monday, June 22 through Friday, July 3, 2020 The County of Santa Cruz Department of Public Works has announced that work on the digout asphalt repair portion of the two projects will take place on the dates and roadways noted below. Project roadways will be subject to traffic delays with potential lane and road closures between the hours of 8:30 a.m. to 4:30 p.m
Rodeo Gulch Rd N(SPOT REPAIRS )Santa Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement
Schulties Rd pm0.51The County of Santa Cruz Department of Public Works has announced that roadway repairs will commence on Schulties Road at PM 0.51, beginning June 1, 2020 through November 2020. Schulties Road will remain closed at PM 0.51 for the duration of the project
Soquel Drfrom Spreckles Dr to Trout Gulch Rd and Aptos Creek RdPotential lane closures between the hours of 8:30 a.m. to 4:30 p.m. beginning Tuesday, June 16, to Monday, November 30, 2020, weather permitting These delays and lane closures are necessary for construction of roadway improvements including a traffic signal, railroad crossing, drainage system, and other items
Spanish Ranch RdPM 0.20 and 0.37County of Santa Cruz Public Works will begin road way repairs on Monday , May 5 , 2020 through the end of OctoberVarious full closures will be necessary to complete the work , between 8:30 am to 4:30 pm . Coordination with residents on Spanish Ranch rRdill occur during this time .
Upper E Zayante Rd., Eagle Tree Ln. to HWY 35Wednesday, August 5 through Tuesday, August 18, 2020 The County of Santa Cruz Department of Public Works has announced that work on the digout asphalt repair portion of the two projects will take place on the dates and roadways noted below. . Project roadways will be subject to traffic delays with potential lane and road closures between the hours of 8:30 a.m. to 4:30 p.m.
Upper E Zayante RdVarious full closures will be necessary to complete the work , between 8:30 am to 4:30 pm . Coordination with residents on Spanish Ranch rRdill occur during this time .Santa Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mBeginning Monday , May 11 , 2020 , lane closures on East Zayante Rd and Upper East Zayante Rd ( between Quail Hollow Rd and Hwy 35 ) will commence at 8:30 a.m. for crack sealing operations . This operation is expected to last through the week
VALENCIA RD PM 2.43The Santa Cruz County Department of Public Works has announced that Valencia Road at post mile 2.43 Monday, July 6 through Sunday, August 16, 2020, weather permitting will be closed 24 hours per day, seven days per weekThis road closure is necessary for construction of a soil nail wall Upon completion , one lane will be open to traffic , with a temporary traffic signal in place. Work includes a soldier pile retaining wall
Varni RdCORRALITOS RD TO AMESTI RDSanta Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement
Vine Hill RdWEST VINE HILL RD TO BRANCIFORTE DRSanta Cruz Co. Public Works 2020 RSTP-STIP RESURFACING PROJECT Monday , May 11 , through Thursday , October 15 , 2020 8:30 a.m to 4:30 p.mThese delays and lane/road closures are necessary for placement of various surface treatments designed to protect the life of the pavement

On-Going Traffic Advisories
Road Name Location Description Status Date
Glenwood Cut Off50 Feet from Glenwood Dr.Cracks in RoadOne Lane Impacted Proceed with Caution.
Green Valley RdAt Mile Post Marker 1.85Slip OutOne Lane Impacted. Proceed with Caution.
Hazel Dell RdFrom Green Valley Rd to Mile Post Marker 2.08Road UnderminedRoadway Closed
Lodge RdAt Mile Post Marker 3.0Roadway Closed due to Slip OutRoadway Is Not Open Due To Unsafe Conditions. Travel Is Not Recommended Through The Area
Lorenzo AveAt 12385 Lorenzo AveWashoutRoadway Closed


CONTACT INFORMATION

For additional information, call the Public Works Maintenance Office at (831) 477-3999 (24 hours)
For assessment of damaged structure or an imminent threat to your home, call the Planning Department Safety Assessment Line at (831) 454-3171
Santa Cruz County Public Works is located at: 701 Ocean Street, Room 410, Santa Cruz, CA 95060

TELEPHONE (831) 454-2160, FAX (831) 454-2385
Office Hours are 8:00 am to 5:00 pm Monday through Friday

  ROAD AND TRAFFIC INFORMATION

For State Highway conditions in Santa Cruz County, contact CALTRANS at (800) 427-7623 (24 hours)
For CALTRANS Internet access use:
http://quickmap.dot.ca.gov
For Santa Cruz County traveler information: http://www.cruz511.org/
For the city of Capitola road and street information, contact the city of Capitola at (831) 475-7300
For the City of Capitola Internet access, use: http://www.ci.capitola.ca.us

Maintained by Santa Cruz County Public Works Operations Section

Back to Top of Page


Authorized Employees Only: Username:   Password: